TUCKER BEACH CYCLE TRAIL

Location: Tucker Beach, Queenstown
Contract Value: $218,200
Project Completion Date:  September 2018
Company: Queenstown Rotary Club

Project Details:

The project involved 1.5km of new cycle trail on road reserve and DOC land, constructed to Grade 2 QLDC Cycle Trail specifications at Tuckers Beach near Queenstown.  This was a technical project which required bridge and weir construction, design and build of timber retaining structures, stacked rock headwalls, pond realignments and safety fencing.  Enabling works included the formation of a 1.5km trail and the re-positioning of an existing pond which had been built on both private and council land in order to achieve specified grades for the trail formation.  


Wilson Contractors received the Environmental Award for this project at the

2019 CCNZ Awards for the Otago Branch